一区中文字字幕AV片|日韩一级视频在线观看|动漫精品3D在线网址黄|免费看欧美一级特黄a大片|一区二区精品在线视频看看|本道久久综合无码中文字幕|久久九九久精品国产免费直播|亚洲毛片不卡av在线播放一区

Wei County Central Urban area clean energy heating project

    The model of clean new energy heating for urban overall transformation

    The project applies sewage and surface water source heat pump systems as well as cold-water phase change energy heat pump systems for an overall emission reduction and energy saving transformation of the Wei County urban area.  The first phase of this project, covering nearly 2 million square meters of heated space, became operational in November 2017.  After the total project is completed, it will meet the space heating demand of 5 million square meters.  At that point, the system will eliminate the need to burn 33,600 (metric) tons of standard coal; thus reducing emissions of CO2 by about 94,400 tons, of SO2 by 1,010 tons, of NOX by about 1,900 tons, and of dust (or particulate emissions) by 6,400 tons, every heating season.
    The Wei County Central Urban area clean energy heating project is the first urban heat network overall cleaning transformation project in China.  As such, it will have a very high project visibility throughout the nation and will serve as an on-going, significant demonstration of KC Blue’s new energy systems’ capabilities. 


阜阳市| 林甸县| 丹巴县| 浑源县| 郑州市| 云和县| 璧山县| 汝南县| 韩城市| 滁州市| 淮北市| 奉贤区| 莱西市| 永修县| 贵溪市| 泰兴市| 东城区| 垣曲县| 青冈县| 霸州市| 台江县| 宁武县| 凤山县| 农安县| 南投市| 衡阳市| 新竹市| 东安县| 普洱| 论坛| 田林县| 云林县| 报价| 宣恩县| 安图县| 广东省| 西贡区| 苏州市| 克东县| 天气| 温泉县|